Skip to content
  • Categories
Collapse
Solibri Society Forum
  1. Home
  2. General Discussion
  3. severity in report

severity in report

Scheduled Pinned Locked Moved General Discussion
2 Posts 2 Posters 510 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • Z Offline
    Z Offline
    Zeraxel
    wrote on last edited by
    #1

    Hi everyone.

    I need to take Severity of the issue in my coordination report in Excel file.
    But even in detailed template there is nothing about severity.

    john.lippJ 1 Reply Last reply
    0
    • john.lippJ Offline
      john.lippJ Offline
      john.lipp
      replied to Zeraxel on last edited by
      #2

      @Zeraxel

      It appears the intention of the severity is to aid in handling issue creation rather than as a mechanism of reporting. In other words, as you manually create slides from results, you can focus on high severity results first by unmarking the others in the checking view. There is a priority field for results which serves the function that you can create your own names (“P1”, “High Severity”, etc). Alternatively, you could create a label.

      If you mark a result as accepted or rejected, it can no longer be filtered in the checking view by the severity (unless you set it back to unhandled).

      I do see the benefit of an enhancement to map severity to a label or priority field automatically either through a setting or perhaps through autorun etc.

      I would suggest posting a recommendation on the https://society.solibri.com/category/18/feature-requests page and hopefully others can up-vote and comment on the functionality.

      1 Reply Last reply
      0

      Copyright © 2025 Solibri Inc. | Powered by NodeBB

      • Login

      • Don't have an account? Register

      • Login or register to search.
      • First post
        Last post
      0
      • Categories